Creative Homes – Day 27 – Coyote Ridge

Creative Homes has continued construction on the home in Coyote Ridge, even though posting has not.  Since the last post the roof has been put on, brick has all been laid, garage door has been installed, exterior paint has been applied, the electrical wiring went in, insulation was installed, sheet rock was put up, tape bed and texture was put on, cabinets installed, trim material installed, and painting on the inside or the home has begun.  The driveway and sidewalk are ready to be poured.  It has been an extremely busy 14 days since the last post.